A kitchen that works the way you cook.
Most of our kitchens keep the footprint and fix everything inside it: the work triangle, the storage, the light. About a third open a wall.
What kitchens cost.
Ranges reflect our completed Kansas City projects from the last two years, including design, permits and every finish.
Why we template counters after the cabinets
Stone counters are cut to the exact cabinets they sit on. Templating from the drawings saves a week but leaves gaps when cabinets are set a quarter inch off. We wait for the cabinets, and the seams show it.
Appliances first
We choose appliances before cabinets, because cabinet sizes depend on them. Ordering appliances in week three means they’re in our warehouse, checked for damage, before demolition.
Asked about kitchens.
How much does a kitchen remodel cost in Kansas City?
At Paseo, kitchens that keep the layout typically run $55,000 to $75,000, kitchens with some layout changes $70,000 to $95,000, and kitchens that open a wall $90,000 to $140,000, all fixed-price before demolition.
How long does a kitchen remodel take?
About ten weeks from first design meeting to final walkthrough, with about five of them without a working kitchen.