Field notes
Notes from the panel.
What we found this month, and what it cost.
Ampersand / Field notes
This month.
Park Hill
EV charger on 100 amps
A 1948 bungalow, 100A service, 48A charger. Load calc came in at 71%. Load manager added, no upgrade. $1,600 total.
Capitol Hill
Knob-and-tube in the attic
Live K&T under blown-in insulation in a 1905 house. Six circuits replaced, the rest disconnected and documented.
Highland
Induction without a new circuit
Picked a range that runs on the existing 40A circuit. Saved the owner a panel replacement.
Your panel could be next month’s note.
A Yeti Trades Co. portfolio site
The electrician’s site, built in seven days.
Sixteen pages: a working panel-load calculator, EV charger pricing with the Xcel rebate explained, an honest page on when you don’t need a service upgrade, and the license number on every screen.